Please use this identifier to cite or link to this item: https://ric.cps.sp.gov.br/handle/123456789/23964
Title: Construstrock sistema para controle de projetos de obras e almoxarifados.
Other Titles: Construstrock system for controlling construction projects and warehouses.
Authors: CAMARGO, Gabriele Garcia
MANDELLI, Isabella Fugioka
SOARES, Jéssica Aparecida
DIONIZIO, Luiz Augusto Ferreira
Advisor: PACHECO, Josilene Franco
type of document: Monografia
Keywords: Construção civil;Materiais;Controle de estoques
Issue Date: Jul-2016
Publisher: 138
Citation: CAMARGO, Gabriele Garcia; MANDELLI, Isabella Fujioka; SOARES, Jéssica Aparecida; DIONIZIO, Luiz Augusto Ferreira, 2016. Trabalho de conclusão de curso (Curso Técnico em Informática) - ETEC Professor Armando José Farinazzo, Fernandópolis, 2016.
Abstract: O presente no sistema se deu a partir de uma pesquisa realizada in locos em uma empresa de construção civil, onde se percebeu que a principal dificuldade em sua administração é controlar o estoque e a compra de materiais em excesso, que se não fiscalizada, pode acarretar em atividades de má índole e possíveis furtos. Tendo em vista a necessidade apontada, o software objetiva-se em controlar rigidamente as principais atividades de uma construtora, como: andamento das obras, suas fases, operários e materiais utilizados; gerência de estoque, funcionários, equipamentos, entre outros. Para tanto, se faz necessário a elaboração e apresentação de relatório específicos que farão com que o administrador tenha total poderio das ações realizadas na empresa e consciência para tomadas de decisões. Espera-se que o sistema em questão, possa sanar as dificuldades da empresa que o utilizará, diminuindo as taxas de furtos e prejuízos causados pelo tal ato. Para a criação dos diagramas utilizou-se a UML. O modelo de programação em camadas MVC, a linguagem de programação Java e a OO. (Orientação a objetos) foram utilizados para a organização dos componentes e elaboração do software.
This system design is made from a survey conducted in locos in a construction company, that was noticed that the main difficulty in its management is to control the stock and buying excess materials that are not monitored, can result in bad character and possible theft activities. Having in mind the need pointed, the objective is to tightly control software on the main activities of a construction, such as construction progress, its phases, workers and materials used; inventory management, staff and equipment, among others. Therefore, an specific report of the preparation and presentation is necessary so the administrator has full power of the shares held in the company and awareness for decision-making. It is expected that the system in question remedy the difficulties of the company that will use, it reducing theft rates and damage caused by such an act. For creating the diagrams it was used the UML The programming model in MVC layers (model-view-controller), the Java programming language and O.O. were used for the organization of components and drafting software.
URI: https://ric.cps.sp.gov.br/handle/123456789/23964
Appears in Collections:Trabalhos de Conclusão de Curso

Files in This Item:
File Description SizeFormat 
SISTEMA DE GERENCIAMENTO DE PROJETO,MÃO DE OBRA,ETAPA E ALMOXARIFADO.pdf
  Restricted Access
2.87 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.